Phone: 020-87540643
Fax: 020-87540663
Technical support: 13824476182
Installation: OBO CNS 3 - D installation is very simple, need to its plug directly into electricity road socket, and then we can put equipment plug into the CNS 3 - D socket can, then insert the lightning protection socket three equipment are protected. Need to pay attention to, must ensure that lightning protection socket has the good earth.
Performance schedule CNS 3 - D lightning protection socket use advantages
LED monitoring equipment for testing pressure sensitive resistance working condition
Rated load current to achieve 16 a can achieve higher load current
Three socket can be connected directly several protected equipment
Y type circuit in the line, the center line, ground transient surge protection more Ann
CNS 3 - D power supply prevents thunder socket technology parameters:
CNS - D lightning protection socket CNS3 - D
Working voltage UN maximum sustainable working voltage UCLPZ area conforms to the DIN VDE0675/6 (11.89) A1, A2 / IEC 61643-1 rated load current IL maximum output power Pmax rated discharge current In (8/20) maximum discharge current Imax (8/20) voltage protection level UP L - NUP L/N - PE response time tA maximum ground connecting wire diameter connecting wire length L 230 v (50-60 hz) 255 v ~ 2-3 d level/class III16A3600W2. 5 ka7ka1. 0 kv1. 5 kv < 25 ns2.5 mm22.0 m